 |
 |
 |
|
1994.
JUL
|
Established at 152-2, Gamjeon -dong, Puk-ku,
Pusan, Korea. |
 |
 |
 |
|
1994.
AUG
|
Developed butterfly forging elbow
for warm water distribution For shipbuilding & started
to deal with local system exporter of Shinsung prefab
systemco.,ltd.(exported to MITSUBISHI in japan).
Started to manufacture fittings for oil pressure and nonferrous
Flanges
(below 2").
Developed ultrasmall oil valves for ship engine. |
 |
 |
 |
|
1994.
SEP |
Started to operate C N C &
short axis automatic lathe.
Developed capsule nozzle for establishing the capital
city of seoul,?Memorial project for 600 years & started
to deal with Samsung Engineering. |
 |
 |
 |
|
1994.
OCT
|
Approved as a nonferrous fittings
& flanges manufacturer by SAMSUNG HAEVY IND,CO., LTD.
Approved as a nonferrous fitting manufacturer for Korean
Navy Special Vessels by TACOMA SHIP YARD & started
to deal with ?local Shipbuilder of ?TACOMA SHIP YARD.
|
 |
 |
 |
|
1994.
DEC
|
Started to deal with MANDO & developed
quick coupling for Gas injection for car air conditioner.
|
 |
 |
 |
|
1998.
JAN
|
Moved to the newly built present
firm building at Hakjang-dong, sasang-ku, Pusan, Korea.
|
 |
 |
 |
|
1998.
FEB
|
Trade name was changed to HAEWON
IND, CO., LTD From KYO YOUNG METAL IND. CO.
Started to manufacture Cu-Ni & Copper Alloy pipe fittings
And Flanges(1/2" ~ 24"). |
 |
 |
 |
|
1998.
MAR
|
Started to deal with HANJIN SHIPBUILDING
CO., LTD. For Copper & Cu-Ni fittings. flanges(1/2"
~ 20")
Started to deal with SAMSUNG SHIPBUILDING & HEAVY
ENGINEERING CORP. for Copper & Cu-Ni fittings and
Flanges(1/2" ~ 20"). |
 |
 |
 |
|
1998.
APR
|
Designated as a specialized firm
in use of facilities for test. Research by regional office
of Pusan-Ulsan small and Medium business administration.
|
 |
 |
 |
|
1998.
MAY
|
Started to deal with CHINA SHIPBUILDING CORP.
For Copper & Cu-Ni fittings.flanges(1/2" ~ 16")
|
 |
 |
 |
|
1998.
JUN
|
Standardized to HAEWON standard from Korean
Navy Shipbuilding standard.
Started to deal with KANGNAM SHIPBUILDING CO., LTD. For
Cu-Ni fittings. Flanges for Korean Navy Project.
Started to deal with local shipbuilder of KTMI for Cu-Ni
fittings. Flanges for Korean Navy Project. |
 |
 |
 |
|
1998.
OCT
|
Approved as Copper, Cu-Ni & Al-Brass fittings
/ flanges ?Manufacturer by Hyundai Shipbuilding. |
 |
 |
 |
|
1999.
JAN
|
Designated as a Specialized Firm for Export
Support by the Small and Medium Business Administation
in Korea.
Approved as a Nonferrous Pipe, Pipe fittings and Flanges
Manufacturer by Mazagon Dock Limited -Offshore Div. |
 |
 |
 |
|
1999.
FEB
|
Designated as a Development Firm of cold forming
conductor by Hyundai Heavy Industries Co., Ltd ? ( Industrial
& Power Systems) |
 |
 |
 |
|
1999.
JUL
|
Approved as an Eexvellent Korean Technology
by the Minister of Science & Technolegy of the Korean
Government. |
 |
 |
 |
|
1999.
SEP
|
Designated as a Venture Enterprise by the
Small and Medium Business Administration (S.M.B.A) |
 |
 |
 |
|
1999.
DEC
|
Approved as an Technology Development Company
by Industrial Bank of Korea. |
 |
 |
 |
|
2000.
JAN
|
Approved as an ISO 9002 / en ISO 9002 Quality
System Certificate by Korean Standards Association Quality
Assurance. |
 |
 |
 |
|
2000.
MAR
|
Approved export Oritneering Project company
by the Small & Medium business administration in Seoul
Korea. |
 |
 |
 |
|
2000.
MAY
|
Approved Superior Manufacturing & Exporting
company by the Small Medium industry promotion corporation
in Seoul Korea. |
 |
 |
 |
|
2000.
JUL
|
Approved superior exporting firm company certificate
by busan, ulsan small & medium business export assistance
center. |
 |
 |
 |
|
2000.
DEC
|
Certificate of highly competive technology
company by medium business administration korea(S.M.B.A)
Approved Superior company by Dae woo shipbuilding Co.,Ltd.
|
 |
 |
 |
|
2001.
APR
|
Approved as an ISO9002/EN ISO9002 quality
system by ansirab(QMS/U.S.A) |
 |
 |
 |
|
2001.
JUN
|
Designated as an venture enterprise by the
small and medium business administration korea(S.M.B.A)
Opening branch office in Dalian china.
|
 |
 |
 |
|
2002.
AUG
|
Approved superior exporting firm
company certificate by Busan, Ulsan small & medium
business export assistance center. |
 |
 |
 |
|
2002.
JAN
|
Approved as an ISO9001(2000 EDITION)quality
system by KSA(Korea Standard Association) |
 |
 |
 |
|
2003.
APR
|
Approved as self-control: & self-guarantee
company by Hyundai Heavy Ind. Co., Ltd |
 |
 |
 |
|
2003.
JUL
|
Designated as an venture enterprise
by the small and medium business administration korea(S.M.B.A)
|
 |
 |
 |
|
2004.
FEB
|
Approved as self-control: & self-guarantee
company by Daewoo Shipbuilding & marine engineering
|
 |
 |
 |
|
2004.
AUG
|
Approved superior exporting firm
company certificate by Busan, Ulsan small & medium
business export assistance center |
 |
 |
 |
|
2005. FEB
|
Approved as self-control on Quality Assurance & self-guarantee company By Daewoo Shipbuilding & marine engineering |
 |
 |
 |
|
2005. SEP
|
Approved as manufacturing CuNi 90/10 Fitting & Flanges Company by BUREAU VERITAS(B.V.)
|
 |
 |
 |
|
2006. MAR
|
Approved as a manufacturing for CuNi90/10, CuNi70/30 Fitting & Flange Company by Kuwait Oil Company(K.O.C.) |
 |
 |
 |
|
2007.
NOV
|
Awarded for Export achievement of 300 million dollars by president |
 |
 |
 |
|
2007. NOV
|
Awarded for commenation by Minister of Commerce, Industry & Energy
|
 |
 |
 |
|
2007. DEC
|
Approved as manufacturing for Cu-Ni Fittings & Flanges Company by ONGC(india) |
 |
 |
 |
|
2007. DEC
|
Approved as manufacturing for Cu-Ni Fittings & Flanges Company by Petrobras(Brasil) |
 |
 |
 |
|
2008. FEB
|
Approved excellent Quality Management System Company by Dae Woo Shipbuilding Co., Ltd.
|
 |
 |
 |
|
2008. JUN
|
Approved excellent exporting firm company certificate by Busan, ulsan small & medium business export assistance center
|
 |
 |
 |
|
2009. JAN
|
Approved as an ISO9001(2000) quality system by DNV(Det Norske Veritas)
|
 |
 |
 |
|
2009. MAY
|
Approved as Cu-Ni fittings and flanges Manufacturer by ONGC.
|
 |
 |
 |
|
2009. JUN
|
Approved as Registered Company by Petrobras Brasil.
|
 |
 |
 |
|
2009. SEP |
Approved as manufacturing Cu-Ni 90/10 FITTINGS & FLANGES MANUFACTURER by Bureau veritas(B.V) |
 |
 |
 |
|
2009. NOV |
Awarded of 5 million US dollars order of industrial expert merit by Korean President MYUNG-BAK LEE |
 |
 |
 |
|
2010. AUG |
Approved as manufacturing for CU-NI FITTING & FLANGES COMPANY PETROBRAS(BRASIL). |
 |
 |
 |
|
2010. OCT |
Move and expansion of the factory building and headoffice to HWAJEON industrial complex. |
 |
 |
 |
|
2010. NOV |
Approved as an ISO9001(2008 EDITION) quality system by DNV (DET NORSKE VERITAS) |
 |
 |
 |
|
Nov. 2013 |
Joined HRD PROCESS PLATFORM PROJECT / ONGC (VELOCITY ENERGY / SINGAPORE) |
 |
 |
 |
|
Dec. 2013 |
Started to business with COCHIN SHIPYARD / INDIA |
 |
 |
 |
|
Dec. 2013 |
EU CE:PED 97/23/EC certified by DNV |
 |
 |
 |
|
Feb. 2014 |
Joined EPC OF EXPANSION OF BAB GAS COMPRESSION PROJECT PHASE 2 ADCO/ PETROFAC EMIRATES LLC (U.A.E.) |
 |
 |
 |
|
Jan. 2015 |
ISO9001 (2015 edition) certified by DNV |
 |
 |
 |
|
Jan. 2015 |
Vendor Approval by ADCO (UAE) |
 |
 |
 |
|
Mar. 2015 |
UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT-EPC2 PROJECT ZADCO / PETROFAC EMIRATES LLC (U.A.E.) |
 |
 |
 |
|
Jun. 2015 |
BURST TEST record for fittings acc. to EEMUA146 approved by ABS |
 |
 |
 |
|
Sep. 2015 |
Vendor Approval by PETRONAS (Malaysia) |
 |
 |
 |
|
Oct. 2015 |
EU PED 97/23/EC MATERIAL MANUFACTURE POST AUDIT BY DNV |
 |
 |
 |
|
Feb. 2016 |
ADMA OPCO SATAH AL RAZBOOT(SARB) FIELD DEVELOPMENT PROJECT PACKAGE 4 / HYUNDAI E&C (KOREA) |
 |
 |
 |
|
Aug. 2016 |
Approved as factory Manufacturing American Bureau of Shipping(ABS) |
 |
 |
 |
|
Dec. 2016 |
Approved as factory Manufacturing Russian Maritime Register of Shipping(RMRS) |
 |
 |
 |